Solutions / Efficiency

SOLUTION · EFFICIENCY

Reduce energy and material loss

Find the loss your reports average away.

Connect energy, scrap, rework, and process conditions to identify loss outside useful production and recommend bounded improvements.

Reduce energy and material loss — IDX-AMOS in a modern manufacturing plant
MONTHLY REPORTING

Totals the loss after the month closes.

WITH IDX-AMOS

Finds it while the batch is running.

01 / THE DIFFERENCE

Where it differs.

Five places where the usual approach stops and IDX-AMOS keeps going.

Monthly reporting
With IDX-AMOS
Visibility
Monthly reportingUtility bills and monthly scrap totals.
With IDX-AMOSEnergy, scrap, and rework tied to the order, line, and shift.
Timing
Monthly reportingAfter the period closes.
With IDX-AMOSWhile the condition is still running.
Cause
Monthly reportingDebated in the review meeting.
With IDX-AMOSLinked to the process conditions behind it.
Action
Monthly reportingA broad savings target.
With IDX-AMOSA bounded, specific improvement, routed for approval.
Follow-through
Monthly reportingChecked next month.
With IDX-AMOSResult measured against the recommendation.
02 / ON THE FLOOR

Same event. Two outcomes.

THE EVENT

A line keeps drawing energy at production levels through a long, unplanned wait for material.

Illustrative scenario

Today

  1. SignalNothing flags it. The line counts as running.
  2. DiagnosisThe energy report shows a high month. Nobody can say which shift.
  3. DecisionA general reminder goes out to switch off idle equipment.
  4. ResultThe same loss repeats.

With IDX-AMOS

  1. ObserveEnergy use is seen against actual output, not on its own.
  2. UnderstandIDX-AMOS links the draw to the material wait and the equipment left at temperature.
  3. PrescribeA standby setting is recommended for long waits, within process limits.
  4. AssistProduction approves; the saving is measured the next time it happens.
03 / WHAT YOU GET

Four things
behind the difference.

Each shares the same IDX-AMOS operating context, so nothing works from a partial picture.

01

Loss in context

See energy, scrap, and rework by order, line, shift, and product.

02

Idle and off-spec detection

Spot consumption outside useful production as it happens.

03

Bounded recommendations

Propose changes that stay inside quality and process limits.

04

Verified savings

Compare the result with the recommendation, every time.

Reduce energy and material loss on the factory floor
THE OUTCOME

Move from reporting loss after the month closes to removing it while production runs.

04 / BEFORE YOU DECIDE

Questions we hear
first.

Bring yours to a walkthrough ↗
Do we have to replace our current systems?

No, though you can. IDX-AMOS can run as your MES, ERP, and QMS in its own right, or work alongside the systems you already have. The right scope for your plant is agreed during the walkthrough.

Will it act without our approval?

Only where you allow it. It acts within the permissions, approvals, interlocks, and evidence requirements you define for each workflow. Human authority stays explicit wherever policy, safety, quality, or risk requires it.

Can we start small?

Yes. Start with one line, one cell, or one workflow. We map the signals, decisions, and controls around it, and agree the measurable outcome before anything is scaled.