Industries / Defence & Aerospace

IDX-AMOS FOR DEFENCE & AEROSPACE

Built for parts that serve for decades and must prove how they were made.

Preserve configuration, process evidence, approvals, inspection history, and auditability across long product lifecycles.

Built for parts that serve for decades and must prove how they were made. manufacturing
01 / SOUND FAMILIAR?

If you run a defence or aerospace plant,
you have lived these.

The part took three months to make. The paperwork to release it takes another week.

An engineering change lands mid-build, and you need to know exactly which units it touches.

A special-process record is missing a signature, and the whole assembly waits.

The customer asks how a part was made eight years ago. Someone goes to the archive.

02 / YOUR NUMBERS

What you are measured on,
and what we do about it.

No new dashboards to watch. Each line below is a decision IDX-AMOS helps your team make earlier.

YOU ARE MEASURED ONConfiguration control
WHAT IDX-AMOS DOES ABOUT IT

Each unit records the revision it was built to, linked from engineering to the floor.

YOU ARE MEASURED ONFirst-pass yield on high-value parts
WHAT IDX-AMOS DOES ABOUT IT

Process drift caught early, when one scrapped part is a serious loss.

YOU ARE MEASURED ONComplete records for release
WHAT IDX-AMOS DOES ABOUT IT

Evidence, approvals, and inspection history captured as the work is done.

YOU ARE MEASURED ONAuditability over the product’s life
WHAT IDX-AMOS DOES ABOUT IT

Every decision, approval, and result kept with the part’s record.

03 / A DAY IN YOUR PLANT

Four moments you will recognize.

Illustrative day

  1. A revised drawing is released for a part already in work.

    IDX-AMOSAffected units and stations are identified. A cut-over point is proposed for approval.

  2. A heat-treatment cycle runs slightly outside its usual profile.

    IDX-AMOSFlagged against the recipe, with the parts in that load identified.

  3. Final inspection begins on a completed assembly.

    IDX-AMOSThe build record is already assembled: materials, processes, operators, checks.

  4. An auditor asks for the history of one serial number.

    IDX-AMOSRetrieved in full, including who approved what.

04 / WHERE TO START

Where defence and aerospace plants
usually begin.

Start with one workflow. These are the closest fit for the problems above.

START WITH ONE WORKFLOW

Bring one problem from your own plant. We will walk through it with you.