Solutions / Integration

SOLUTION · INTEGRATION

ERP Integration

Close the gap between the plan in ERP and the floor.

Connect ERP orders, inventory, materials, costing, and delivery commitments with live shopfloor execution through validated APIs and controlled data flows.

ERP Integration — IDX-AMOS in a modern manufacturing plant
BATCH UPDATES AND RE-KEYING

ERP learns what happened at the end of the shift.

WITH IDX-AMOS

ERP and the floor stay in step.

01 / THE DIFFERENCE

Where it differs.

Five places where the usual approach stops and IDX-AMOS keeps going.

Batch updates and re-keying
With IDX-AMOS
Data flow
Batch updates and re-keyingBatch uploads, spreadsheets, and re-keying.
With IDX-AMOSValidated APIs and controlled data flows, in both directions.
Timing
Batch updates and re-keyingEnd of shift, or end of day.
With IDX-AMOSAs production happens.
Inventory
Batch updates and re-keyingBook stock drifts away from actual stock.
With IDX-AMOSConsumption and output posted from real execution.
Order status
Batch updates and re-keyingChased by phone.
With IDX-AMOSVisible against the delivery commitment.
Control
Batch updates and re-keyingErrors found at month-end.
With IDX-AMOSEvery exchange validated, logged, and traceable.
02 / ON THE FLOOR

Same event. Two outcomes.

THE EVENT

A rush order is released in ERP in the middle of a shift.

Illustrative scenario

Today

  1. SignalThe floor hears about it at the next planning meeting.
  2. DiagnosisPlanning checks material and capacity by phone.
  3. DecisionThe order is squeezed in. Consumption is booked later.
  4. ResultERP shows stock that is no longer there.

With IDX-AMOS

  1. ObserveThe order reaches the floor as it is released.
  2. UnderstandIDX-AMOS checks live capacity, material, and current commitments.
  3. PrescribeA feasible slot is proposed, with its effect on other orders.
  4. AssistPlanning approves; progress and consumption post back to ERP as they happen.
03 / WHAT YOU GET

Four things
behind the difference.

Each shares the same IDX-AMOS operating context, so nothing works from a partial picture.

01

Order and schedule sync

Orders, priorities, and changes carried from ERP to execution.

02

Actual consumption and output

What was really used and made, posted back.

03

Costing inputs

Costing fed with real material, time, and scrap.

04

Validated exchange

Every transaction between systems checked, logged, and traceable.

ERP Integration on the factory floor
THE OUTCOME

Move from reconciling ERP with the floor to running both from the same facts.

04 / BEFORE YOU DECIDE

Questions we hear
first.

Bring yours to a walkthrough ↗
Do we have to replace our current systems?

No, though you can. IDX-AMOS can run as your MES, ERP, and QMS in its own right, or work alongside the systems you already have. The right scope for your plant is agreed during the walkthrough.

Will it act without our approval?

Only where you allow it. It acts within the permissions, approvals, interlocks, and evidence requirements you define for each workflow. Human authority stays explicit wherever policy, safety, quality, or risk requires it.

Can we start small?

Yes. Start with one line, one cell, or one workflow. We map the signals, decisions, and controls around it, and agree the measurable outcome before anything is scaled.