Industries / FMCG

IDX-AMOS FOR FMCG

Built for lines that run fast, change often, and work on thin margins.

Coordinate fast lines, frequent changeovers, short shelf lives, and shifting demand by connecting line performance, quality checks, materials, and energy across every shift.

Built for lines that run fast, change often, and work on thin margins. manufacturing
01 / SOUND FAMILIAR?

If you run an FMCG plant,
you have lived these.

Changeovers all day, and every one costs minutes you do not have.

A little overfill on every pack adds up to a serious number by year end.

The filler stops for under a minute, dozens of times a shift. Nobody logs it.

A retailer complaint names a date code. You need to know what else carries it.

02 / YOUR NUMBERS

What you are measured on,
and what we do about it.

No new dashboards to watch. Each line below is a decision IDX-AMOS helps your team make earlier.

YOU ARE MEASURED ONLine efficiency (OEE)
WHAT IDX-AMOS DOES ABOUT IT

Short stops and slow running captured and linked to their cause.

YOU ARE MEASURED ONChangeover time
WHAT IDX-AMOS DOES ABOUT IT

Guided changeovers, verified for the product and the pack.

YOU ARE MEASURED ONGiveaway and waste
WHAT IDX-AMOS DOES ABOUT IT

Fill weight, scrap, and rework tied to line conditions.

YOU ARE MEASURED ONComplaint and recall response
WHAT IDX-AMOS DOES ABOUT IT

Batch and date-code genealogy from materials to dispatch.

03 / A DAY IN YOUR PLANT

Four moments you will recognize.

Illustrative day

  1. First changeover: a new pack size.

    IDX-AMOSSettings and checks are verified step by step.

  2. Short stops build up on the labeller.

    IDX-AMOSThe pattern is recognized and linked to one reel of labels.

  3. Fill weights creep above target.

    IDX-AMOSFlagged before the giveaway adds up. An adjustment is recommended.

  4. A promotional order is brought forward.

    IDX-AMOSA feasible plan is proposed around materials and shelf life.

04 / WHERE TO START

Where FMCG plants
usually begin.

Start with one workflow. These are the closest fit for the problems above.

START WITH ONE WORKFLOW

Bring one problem from your own plant. We will walk through it with you.