Industries / Electronics

IDX-AMOS FOR ELECTRONICS

Built for lines where products change in months and a defect repeats in seconds.

Coordinate fast-changing production, serial-level traceability, quality signals, and material risk across electronics operations.

Built for lines where products change in months and a defect repeats in seconds. manufacturing
01 / SOUND FAMILIAR?

If you run an electronics plant,
you have lived these.

A component lot turns out to be suspect. Which boards is it on?

The line changes product several times a shift, and yield dips after every change.

One missing part number stops a line that has everything else ready.

A field failure comes back, and you need that board’s full history today.

02 / YOUR NUMBERS

What you are measured on,
and what we do about it.

No new dashboards to watch. Each line below is a decision IDX-AMOS helps your team make earlier.

YOU ARE MEASURED ONFirst-pass yield
WHAT IDX-AMOS DOES ABOUT IT

Yield loss linked to the machine, feeder, program, or lot behind it.

YOU ARE MEASURED ONComponent-level traceability
WHAT IDX-AMOS DOES ABOUT IT

Each board tied to the component lots, machines, and tests it passed through.

YOU ARE MEASURED ONChangeover time
WHAT IDX-AMOS DOES ABOUT IT

Guided, verified setups for the product running.

YOU ARE MEASURED ONMaterial availability
WHAT IDX-AMOS DOES ABOUT IT

The shortages that will actually stop a line, seen in time to act.

03 / A DAY IN YOUR PLANT

Four moments you will recognize.

Illustrative day

  1. First changeover of the day.

    IDX-AMOSThe setup is verified step by step against the product revision.

  2. Solder defects creep up on one line.

    IDX-AMOSInspection results are linked to the stencil, the paste lot, and when it began.

  3. A reel is projected to run out before the order completes.

    IDX-AMOSAllocation options are shown that protect the priority order.

  4. A supplier issues a notice on a component lot.

    IDX-AMOSEvery board carrying that lot is listed, shipped or not.

04 / WHERE TO START

Where electronics plants
usually begin.

Start with one workflow. These are the closest fit for the problems above.

START WITH ONE WORKFLOW

Bring one problem from your own plant. We will walk through it with you.